-
Investigation of about the effective parameters on the underground circular tunnel settlement using FEM and PLAXIS software
-
- تاریخ انتشار 1397/01/10
- تعداد صفحات 11
- زبان مقاله انگلیسی
- حجم فایل 796 کیلو بایت
- تعداد مشاهده چکیده 221
- قیمت 29,000 تومان
- تخفیف 0 تومان
- قیمت با احتساب تخفیف: 29,000 تومان
- قیمت برای کاربران عضو سایت: 23,200 تومان
- محل انتشار اولین همایش ملی افق های نوین در توانمندسازی و توسعه پایدار معماری، عمران، گردشگری و محیط زیست شهری و روستایی
-
نویسندگان مقاله
- reza Heidari Teacher - geotechnical engineer Sama technical and vocatinal training college , Islamic Azad University , Karaj Branch , Karaj , Iran.
-
چکیده مقاله
Tunnels are the famous underground structures . We can use the analytical , experimental and numerical methods to analysis the tunnels . Numerircal methods such as FEM , FDM , … are reliability , fast and are the best , special for the complex boundary conditons . Finite element method (FEM) and PLAXIS software used to parametric research of the effective elements on the tunnel settlemet . Diameter of tunnel , Depth of tunnel ( the distance between the tunnel center to the ground surface ) , adjacent building loading and distance between the tunnel center to the building , water table , earthquake loading were the effective parameters on the tunnel structural behavior for the both of adhesive and cohesionless soils . Settlement of the tunnel crest was investigated in this article . The results showed the increasing settlement with the tunnel diameter unless for the diameter 4 to 5 meters and reducing the settlement with the tunnel depth unless for the tunnel depth 15 to 20 meters for the undrained adhesive soil and the 6 stories building equivalent surcharge . The results showed reducing settlement with the tunnel diameter up to 4 meters for diameter and then increasing rapidly for the higher diameter values , Also the settlement reducing with the tunnel depth until the depth 15 meters and then increasing with the tunnel depth for the higher values for the cohesionless soil and the 6 stories building equivalent surcharge too .The results showed the linear relationship between the crest settlement and the building surcharge . The results showed that the crest settlement increases with the distance ( between tunnel center and building center ) until about 50 meters and then constant . For two horizontal tunnel dugout , the settlement reduces up to 40 meters for the center to center distance and then increases , but this settlement relationship to the soil and tunnel
-
کلید واژه
Underground structure / Analytical / Experimental / Numerical / Reliability/ Adhesive soil / Cohesionless soil
-
راهنمای خرید و دانلود
- اگر در مجموعه Confpaper عضو نیستید، به راحتی می توانید از طریق دکمه زیر اصل این مقاله را خریداری نمایید .
- با عضویت در Confpaper می توانید اصل مقالات را با حداقل 20 درصد تخفیف دریافت نمایید .
- برای عضویت به صفحه ثبت نام مراجعه نمایید .
- در صورتی که عضو این پایگاه هستید،از قسمت بالای صفحه با نام کاربری خود وارد سایت شوید .
- لینک دانلود فایل خریداری شده به ایمیل شما ارسال میگردد .
نظرات کاربران
برای ارسال نظر، لطفا وارد حساب کاربری خود شوید.