A Practical Investigation of Production Performance at the Gohar Zamin Iron Ore Complex (Sirjan, Iran) Using Mean- and Target-oriented Monitoring
-
- تاریخ انتشار 1398/07/06
- تعداد صفحات 11
- زبان مقاله انگلیسی
- حجم فایل 845 کیلو بایت
- تعداد مشاهده چکیده 178
- قیمت 29,000 تومان
- تخفیف 0 تومان
- قیمت با احتساب تخفیف: 29,000 تومان
- قیمت برای کاربران عضو سایت: 23,200 تومان
- محل انتشار سومین کنفرانس بین المللی نوآوری و تحقیق در علوم مهندسی (ICIRES 2019)
-
نویسندگان مقاله
- Naeim Zeidabadi Nejad Director of Planning and Production Control Management Unit, Gohar Zamin Iron Ore Complex, Sirjan, Iran
- Arash Habibi Duty Member of the Board of Directors, Gohar Zamin Iron Ore Complex, Sirjan, Iran
- Ali Nasiri Director of Internal Auditing and Inspection, Gohar Zamin Iron Ore Complex, Sirjan, Iran
- Soroush Arabzadeh Jarkani Director of Water Recovery Project, Gohar Zamin Iron Ore Complex, Sirjan, Iran
- Hamid Khoshdast Department of Mining Engineering, Higher Education Complex of Zarand, Zarand, Iran
-
چکیده مقاله
Among the various scientific methods for the industrial process monitoring, statistical approaches for the ease of perception as well as application, analysis and interpretation are particularly important. These approaches consider different methods for engineers in terms of process monitoring and control; however, the proper method should be based on the process. Among the various statistical process control methods, the control chart methods have been highly accepted by the industry. By adjusting the visual monitoring results, these methods easily provide the opportunity to detect the conditions out of or undergoing process control and, as a result, enable the process engineer to adopt and apply the best control decisions while determining and distinguishing special and common causes. In this paper, the production efficiency of the Gohar Zamin Iron Ore Complex (Sirjan, Iran) was analyzed using Individual-Moving Range and CUSUM control charts in 2018. Throughput to the plant No. 1 and tonnage of concentrate were considered as process responses. Analysis of control charts showed that plant capacity could be increased by up to 50 t/h by adopting appropriate decisions.
-
کلید واژه
//
-
راهنمای خرید و دانلود
- اگر در مجموعه Confpaper عضو نیستید، به راحتی می توانید از طریق دکمه زیر اصل این مقاله را خریداری نمایید .
- با عضویت در Confpaper می توانید اصل مقالات را با حداقل 20 درصد تخفیف دریافت نمایید .
- برای عضویت به صفحه ثبت نام مراجعه نمایید .
- در صورتی که عضو این پایگاه هستید،از قسمت بالای صفحه با نام کاربری خود وارد سایت شوید .
- لینک دانلود فایل خریداری شده به ایمیل شما ارسال میگردد .
نظرات کاربران
برای ارسال نظر، لطفا وارد حساب کاربری خود شوید.